INDUSTRIES · CONSTRUCTION AND CDM
Who's on site, where, and are they inducted?
Contractor headcounts, induction control and plant tracking for major projects.

Large construction projects churn hundreds of contractors across many trades and companies. Knowing who is on site, whether they are inducted, and where high-value plant has gone is a daily struggle. The Salvus Network detects every safety tag at gates and level access points to keep an accurate contractor headcount, enforce induction before restricted-zone entry, and track plant and tools automatically.
Regulatory landscape
What the rules require.
Supports duties under the Construction (Design and Management) Regulations 2015 (CDM), including site induction, access control and emergency arrangements.
How Salvus fits
The jobs that matter for construction & cdm.
Evacuation & Mustering
Roll-call-free mustering that turns a chaotic evacuation into a live, auditable head count in seconds.
Asset Tracking
Asset tracking that flags unauthorised removals at the gate and surfaces idle or missing kit before it costs you.
Contractor Management
Induction verification and access gating that keep un-inducted contractors out of restricted zones automatically.
How we compare
Full coverage, not turnstiles.
| Capability | Manual roll-call | Turnstile RTLS | The Salvus Network |
|---|---|---|---|
| Real-time head count | |||
| No choke points / turnstiles | |||
| Auditable muster record | |||
| Zone-level awareness | |||
| Lone-worker welfare alerts | |||
| Live in the first meeting | |||
| UK data residency + Cyber Essentials |
Frequently asked questions
Is The Salvus Network suitable for construction & cdm sites?+
Yes. The Salvus Network is a complete, off-the-shelf solution built for high-risk, fast-changing construction sites. Safety Detection Points and safety tags give a live, auditable picture of where people were last detected, without turnstiles or manual sign-in.
How does Salvus support compliance for construction & cdm operators?+
It keeps an auditable contractor head count, induction record and access log that supports duties under the Construction (Design and Management) Regulations 2015 (CDM), including site induction, access control and emergency arrangements.
What does the salvus network address on a construction & cdm site?+
Large projects churn hundreds of contractors across many trades. The platform keeps an accurate contractor head count, enforces induction before restricted-zone entry, and tracks plant and tools automatically.
Can we see the salvus network running before we commit?+
Yes, a guided live walk-through shows the platform in action, and you can see the operator console working in the first meeting.
Book a live evacuation demo
A guided live walk-through of what the platform can do.